Progress Update Eight
It’s only Wednesday which is half way into week nine of our build, but we were just so darn ecstatic about our new hospital finally taking shape that we needed to share this post and pics with you asap. Luke and his team (namely his brother Mark) have been busy measuring and flicking out the lines for the steel frame.
This was an extremely exciting time as could then get a feel for the size and placement of each room, where the plumbing and drains had been placed and sould really start to imagine the cabinetry and furniture placement.
Than literally within a day, our concrete slab with marked red lines turned into a house with external steel walls, window openings and a wide and welcoming front door.