Progress Update: Twenty Three
Progress has continued at record speed in particular this week with the downstairs hospital really taking shape. The much debated vinyl flooring has been layed and coved up the white custom cabinetry. This really makes a huge difference by making the space feel much more finished!
Concrete pathways continue to be poured, block stairs are being errected in the carpark and finishes such as fire extinguishers, signage and alarms/security systems are going in quickly. A portion of the black aluminium fencing has also been installed out the back with the scroll detail chosen by Lisa – it looks fab!
Carpet has also been installed upstairs along with shower screens and mirror wardrobe doors, bringing the upstairsto a stage where we’re opting to lock it up to keep it clean, ha. Lastly, we’ve hit a hiccup with Energex and accessing power which may delay our opening slightly, however we will keep you posted!
[/vc_column_text][vc_separator type=”transparent” up=”30″]
[/vc_column][/vc_row]